Lockport THSD 205 - 2024 Ceiling Replacement at Lockport Township HS Central Campus

The project includes, but is not limited to, the following: the demolition and replacement of existing plaster ceiling assemblies with acoustic lay-in ceiling grid assemblies including select electrical, mechanical, plumbing, plaster repair, and structural repair work.
Addendum #1 (click to expand/collapse)
Name Size
Addendum #1 170.5 KB
Addendum #2 (click to expand/collapse)
Name Size
Addendum #2 9.6 MB
Addendum #3 (click to expand/collapse)
Name Size
Addendum #3 544.2 KB