Lockport THSD 205 - 2024 Ceiling Replacement at Lockport Township HS Central Campus

The project includes, but is not limited to, the following: the demolition and replacement of existing plaster ceiling assemblies with acoustic lay-in ceiling grid assemblies including select electrical, mechanical, plumbing, plaster repair, and structural repair work.
Specifications (click to expand/collapse)
Name Size
Project Manual 22.0 MB